2x
4. Draw the drill holes onto the wall through
the openings inside the appliance.
5. Carefully remove the exhaust hood
again.
6. Drill the holes in the wall at each of the
marked points. The diameter must corre-
spond to the dowels.
7. Insert two dowels into the holes.
8. Hook the Chimney hood into the wall
mount again.
9. Screw the Chimney hood tightly onto the
wall with two screws.
The Chimney hood is now secure.
Materials required for assembly
Installing the chimney
1. Screw the wall mount (5) to the wall with
two screws.
(8)
2. Screw the retaining plate (6) from the out-
side to the lower part of the flue screen
(2)with two screws (8).
3. Push the upper part of the flue screen into
the lower part.
Page EN-13
(5)
(6)
(2)