Herunterladen Inhalt Inhalt Diese Seite drucken

Check The Delivery; Package Contents; Packaging Tips - hanseatic SY-3502D-E5-C59-L52-600 Gebrauchsanleitung

Kaminhaube
Vorschau ausblenden Andere Handbücher für SY-3502D-E5-C59-L52-600:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Delivery

Package contents

(1) Exhaust hood
(2) Flue screen, 2-piece
(3) Exhaust air operation: Exhaust air hose
(4) Exhaust air operation: Check valve
(5) Wall mount for flue screen
(6) Retaining plate for flue screen
(7) Wall bracket for exhaust hood
(8) 4 screws 4.0 × 8 mm
(9) Cable ties
The screws and dowels required to
mount the appliance on a wall are
not part of the delivery, as their type
and dimensions vary depending on
the characteristics of the wall. Please have
(1)
a specialist advise you as to which ones you
need (see „Materials required for assembly"
on page EN-10).
An activated charcoal filter for air circulation
(2)
is not included in the package contents. To
order accessories, see EN-21.

Check the delivery

(3)
1. Unpack the appliance.
2. Leave the blue protective film on the met-
(4)
al surfaces!
3. Remove all other parts of the packaging,
(5)
plastic profiles, tape and foam padding.
4. Check that the delivery is complete.
(6)
5. Check whether the appliance was dam-
(7)
aged during transit.
6. If the delivery is incomplete or the appli-
(8)
ance has been damaged during transit,
please contact our service department
(9)
(see „Our Service Centre" on page EN-21).
WARNING!
Never use a damaged appliance.

Packaging tips

If you have sufficient space, we rec-
ommend keeping the packaging, at
least during the warranty period. If
the appliance needs to be sent out for repairs,
only the original packaging will provide suffi-
cient protection.
If you would like to dispose of the packag-
ing, please dispose of it in an environmentally
friendly way.
Page EN-3
Delivery

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sy-3502d-e5-c59-l52-900

Inhaltsverzeichnis