Start-up Operations
6
Start-up Operations
Personnel:
DANGER!
– The dosing pump must not be brought into service without line connections!
– The union nuts must be tightened!
– When putting into service, wear personal protective equipment and observe
safety notes according to product data sheets.
IMPORTANT
1.
Check for correct installation of suction and pressure lines.
2.
Set the maximum flow rate.
Ä Chapter 6.1.1 'Setting the flow rate' on page 33.
3.
Start pump(s) (electrical connection / control).
4.
Check functioning of pump(s).
5.
Check components carrying media, especially line connections, for tight seals.
Rev. 5-06.2018
n
Mechanic
n
Qualified electrician
n
Specialist
n
Servicing personnel
Before putting pump into service, tighten the pump head screws
(pos. 28) crosswise with 3.75 Nm!
30