5.1 Getting the system ready for operation
Plug the mains plug of the control unit into the
socket. The system will initialise automatically.
During initial initialisation of the system, the
control unit requires that the user select four
basic settings.
1. Language
2. Date/time
3. Type of system*
4. Typ of coalesence separator*
➤ Selection using
Stored in system memory by pressing "OK"
➤ After setting 1 to 4
Switch unit loads program memory
➤ Start operating mode
➤ System is ready for operation
5.2 Calibration of level compensation
Automatic calibration can be carried out du-
ring initial start-up (operating menu item 0.6).
5. Operation

5.3. Operator's duties

Checks
- for transport or installation damage
- for structural defects of all electrical and me-
chanical components for seat and function
- the cable connections
Customer instruction based on the instal-
lation and operating instructions
- Go through installation and operating in-
structions with the customer
- System operation (explaining and descri-
bing)
- Explanation to the customer about the ope-
rator's duties
- Remind about regular servicing (see chapter
6)

5.4 Instruction / Handover

The chapter "Safety instructions" must
be heeded (page 4)!
Commissioning is carried out by a specia-
lised firm or by an authorised KESSEL
agent (at an additional charge). The follo-
wing persons should be present for the
handover:
- Person authorised to perform the accep-
tance on behalf of the building owner
- Specialised firm
In addition, we recommend the participati-
on of operating personnel/operator and the
waste disposal contractor.
Summary of instructions:
- Get the system ready for operation
- Check the system
- Instruction based on the installation and
operating instructions
- Preparation of the handover certificate
➤ Once instruction is completed, the sy-
(see chapter 13)
stem must be made ready for operation.
52