5. Installation

Warning:
- The electrical installation must be carried out by a skilled electrical engineer with the
relevant training and qualifications.
- Disconnect the power supply before carrying out work on the unit.

5.1. Checks

- Check that the equipment is undamaged and that you have received the correct version.
- Check that the details on the packing slip correspond to the details of the product received.
- Check that the voltage shown on the rating plate corresponds to the (mains) voltage you
intend to use.
If you have any problems and/or doubts, please contact SIMCO (Nederland) B.V. or the agent
in your region.

5.2. MPM installation

5.2.1. Overview

The MPM must be assembled within the range of the connection cables of the ionisation
equipment and in such a way that the switch and control LEDS are clearly visible
and accessible.
We recommend that the MPM is switched on/off via the machine.
If the MPM is fitted with the remote control functionality (MPM-xxR), we
recommend that the high voltage of the MPM is switched on and off via the remote
control.
Note:
- Earthing must be via the power cable and via the external earth wire to the earthing
point on the MPM. Connect the external earth wire to an earthed machine part
Figure 2: MPM assembly holes