HYDRIM M2 G4 Installation Instructions
Annual Service Requirements
It is recommended that a SciCan-approved service technician perform an annual check.
Installation, commissioning, annual servicing MUST be undertaken by SciCan approved
technicians. Failure to maintain this equipment may invalidate the results of the following
testing regime.
The recommended periodic testing protocols are listed in the table below:
Upon installation
Daily tests and checks
Annually
Bi-Annually
The following checks are recommended in order to maintain optimum performance of
the unit.
Annual service schedule
• Check integrity of incoming and outgoing services (power, water supply, drain)
• Check water supply in line filters and clean as appropriate
• Check general condition of machine
• Replace dryer filter and reset dryer counter (only if required)
• Inspect and replace main chamber seal (only if required)
• Inspect and replace lower door seal (only if required)
• Check solution container connection for leaks
• Check salt level and replenish as required
• Check water hardness (test strips) and adjust salt regeneration settings if required.
• Inspect and clean sump filters (check sump for debris)
• Check wash arms for blockages and remove them for cleaning if required.
• Review error history
• Software upgrade (if necessary)
When
SciCan-approved
SciCan-approved
SciCan-approved
Who
•
Commissioning/Installation testing as
By a
outlined in the installation document included
with the unit.
technician
•
First validation if required by local
regulations.
•
door lock check
•
wash arm rotation check
•
door seal check
By the user
•
load carrier check
•
check and clean chamber filters
•
visual examination (inspection under
magnification) of each load for residual soil.
By a
•
Annual maintenance schedule
as outlined in the service manual
technician
By a
•
Re-validation if required by local regulations.
technician
Page 15
What Tests