Herunterladen Diese Seite drucken

Used Batteries; Checking The Battery Charge Level; Operation; Choice Of Gear - Parkside PBSA 12 B1 Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für PBSA 12 B1:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 59
G B
CY
Overview of the LED indicators on
the charger (13):
Green LED (15) lights up
without battery inserted:
Charger ready.
Green LED (15) lights up:
Battery such alleged
charged.
Red LED (16) lights up:
Battery charging.

Used batteries

If a fully recharged battery lasts for
considerably shorter operating times,
the battery is used up and needs to be
replaced. Only use an OEM battery
pack replacement available from our
Customer Service.
Always take heed of the applicable
safety instructions as well as the envi-
ronmental protection regulations and
information (see "Cleaning and Main-
tenance").
Checking the battery charge
level
The battery's (
7) charge level is indi-
cated by the charge state indicator (
The LEDs indicate the battery's charge
level, when the device is in operation.
red-yellow-green => Battery fully
red and yellow
red
1 2
charged
=> Battery half charged
=> Battery needs to be
charged

Operation

Choice of gear

Slide the gear selector (5) to 1 or
2, corresponding to a low or high
torque selection.
A gear change may only be per-
formed in standstill mode!

Set the direction of rotation

You can select the direction of rotation with
the direction switch (clockwise and anti-
clockwise direction) and secure the device
against accidental start up.
1. Wait for the device to shut-down.
2. Clockwise direction:
Press direction switch (6) to
the right.
3. Anticlockwise direction:
Press direction switch (6)
to the left.
4. Switch lock: Bring direction
switch to neutral position.
The direction changed may only be
performed in standstill mode.

Torque setting

4).
You can preset the maximum torque by ro-
tating the torque adjustment ring (3).
19+1 torque levels are provided.
1. Turn the adjusting ring (3) to se-
lect the desired torque:
Step 1 -->
Step
Screws:
Drilling:
lowest torque,
-->
highest torque.
Steps 1 - 19
Step .

Werbung

loading