Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

9.0.1
Pre pa ra ti on for sto ra ge
If the ma chine is to be shut down for an ex tended time (lon ger
than 6 weeks), it should be placed stably on a pal let on a firm,
even sur face.
The stor age area should be dry and pro tected.
The am bi ent tem per a ture should be be tween 0°C / 32°F and
45°C / 113°F.
Be fore stor ing the ma chine
-
clean it thor oughly
-
check for leaks and dam age, and fix any prob lems.
-
cover it with a pro tec tive tar pau lin.
9.0.2
Re turn to ser vice
Be fore us ing the ma chine again, check for
-
leaks,
-
de fec tive or leaky hy drau lic hoses, and
-
any other dam age.
Re pair any prob lems found.
Check all screw joints and tighten them.
61

9. Stor age

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Apf 15/40Apf 15/50Apf 20/50

Inhaltsverzeichnis