Preparing for first-time use
Equivalent leakage current measurement (I-EA)
Illustration 8
The DUT is connected to the test socket and has to be switched on.
A low protection voltage is put between the PE conductor and the active
lines (phase and neutral) of the test sockets.
The test leads are only needed in the following cases:
With protection class-I devices: To test exposed conductive compo-
|
nents that are not connected to the PE conductor.
With protection class-II devices: To test all exposed conductive com-
|
ponents.
60
®
Testboy
TV 470