Herunterladen Inhalt Inhalt Diese Seite drucken

Leakage Current Measurement - Unitest BEHA CHB 5 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.3

Leakage Current Measurement

Before switching to a new function, the probes must always be removed from the
UUT.
1)
Turn selector switch (3) to the current range mA
2)
Open the clamp, and close it round the conductor. Make sure that the clamp proper-
ly encircles the conductor, and that there is no air gap between the jaws. For best
measurement results and highest accuracy, have the conductor placed in center of
clamp jaws.
Only use the frequency range switch (10) for hamrmonics wave
measurement.
Leakage measurement (Differential mode)
If the display is not visible during measurement, press the "HOLD" button (4) to
retain the display. The clamp can then be removed from the conductor and the sto-
red value read.
Addtional it´s possible to activate the MAX.-MIN.- PEAK measurement. Press the
key
(4) to select the mode.
Leakage measurement (Differential mode)
L
N
PE
8
L
N
PE

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis