Herunterladen Inhalt Inhalt Diese Seite drucken

How To Demount System 5000 - PR Elecronics 5116 Handbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

CAlIBRATION AND ADjUSTMENT
During calibration and adjustment, the measuring and connection of external
voltages must be carried out according to the specifications of this manual. The
technician must use tools and instruments that are safe to use.
NORMAl OPERATION
Operators are only allowed to adjust and operate modules that are safely fixed
in panels, etc., thus avoiding the danger of personal injury and damage. This
means there is no electrical shock hazard, and the module is easily accessible.
ClEANING
When disconnected, the module may be cleaned with a cloth moistened with
distilled water.
lIABIlITy
To the extent that the instructions in this manual are not strictly observed, the
custom er cannot advance a demand against PR electronics A/S that would
otherwise exist according to the concluded sales agreement.

hOW TO DEMOUNT SySTEM 5000

First, remember to demount the connectors with hazardous voltages.
Picture 1:
Detach the module from the DIN rail
by lifting the bottom lock.
27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis