Herunterladen Inhalt Inhalt Diese Seite drucken

Nova PENTAGON 100 Handbuch Seite 36

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

_70
Release the end of the bridle. Fold the suspension lines in the shape of an »S«, to
90 cm before the bridle.
Place the lines between the folded canopy and the side of the deployment bag.
Close the deployment bag with a loop of suspension lines of 5 to 6 cm (approx.
3 fingers wide).
The pressure on the central closure bungee is controlled by the integrated loop
tensioner. This is set so that the parachute is deployed by pulling the bridle from
the deployment bag. The loop tensioner is located under the fourth leaf of the de-
ployment bag and the tension is regulated with the black bungee.
_71
_EN

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pentagon 120Pentagon 145

Inhaltsverzeichnis