The lip seal must be fitted in the cover plate.
Care must be taken that the sealing lip and
Fig. 5
mind. 40mm
5-10mm
centring lug are facing upwards during in-
stallation. The centring lug must be placed
in the recess (see Fig. 6).
When a surface water resistant cover plate
is used, a ventilation pipe DN 50 is required.
Fig. 6
2. Installation
Only cast the tank in a concrete bed after
connection of all the pipes and a leak test.
Installation of covers with a choice of
finishes
With the covers with a choice of finishes,
tiles or natural stone can be inserted in the
cover on site, so that they can be matched
to the room's flooring. Products e.g. from
PCI, Schomburg, Deitermann are suitable
for tile laying. To achieve straightforward
processing and adhesion, we recommend
the following procedure:
Tile laying
a) Prime the cover plate e.g. with PCI primer
303. Following the respective flash-off time,
lay the tiles e.g. with PCI flexible mortar.
This type of laying is particularly suitable
for thinner tiles since the base can be filled
up to the required height.
b) Lay the tiles e.g. using PCI Silcoferm S
(self-adhesive silicone). This allows a thin
adhesive bed to be used, particularly good
for thicker tiles.
Laying natural stone
(marble, granite, agglo-marble):
a) Prime the cover plate e.g. with PCI primer
303. Lay the natural stone panels using e.g.
PCI-Carralit.
b) b) Lay the natural stone panels using e.g.
PCI-Carraferm (special silicone for natural
stone). Application areas analogue to 1
2.2 Lifting station Aqualift S for reces-
sed istallation in the ground plate
(with extension piece art. no.: 83071)
Depending on the installation depth, one or
two extension pieces can be inserted bet-
ween the upper cover section and the ad-
apter. The respective seals must be grea-
sed accordingly.

2.3 Installation in water load

If installation in water load is required, the
KESSEL lifting station Aqualift S can be
sealed quickly and easily. For this purpose
seal sheeting is clamped between the pla-
stic counterflange and the compression
26