Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Setting The System In Place - Kessel GTF 500 Einbau- Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für GTF 500:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
4

Installation

4.1
Installing the fittings
Grease seals on the flap housing and backflow preventer
if required.
Clip on the flap housing.
(Ensure that both clips latch into the locking device simul-
taneously).
Check whether the turn fastener is locked in place.
Lift the quick-release closure.
4.2

Setting the system in place

The tank must be aligned vertically on a blinding layer.
Alternatively, the system tank can also be fastened with
threaded rods (max. M10) fed through the eyes in the
edge of the system tank.
The profile lip seal must be placed in the tank groove.
Determine the height to the planned floor level, checking
whether the installation of an additional extension section
is necessary.
The upper section is height-adjustable. However, the min-
imum insertion depth (47 mm) of the upper section must
be taken into account. The upper section can be short-
ened accordingly if necessary.
Trial-fit upper section and cover plate.
The cover plate also provides protection during the con-
struction period.
To ensure easier removal of the upper section, the profile
lip seal can be greased later.
24 / 100
Lifting station/Installation and operating instructions
016-059

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Gtf 500 resistantGtf 1200Aqualift s compact

Inhaltsverzeichnis