INSTRUCTIONS FOR INSTALLATION, OPERATION AND MAINTENANCE
KESSEL lifting station Aqualift S
for wastewater with sewage for underground/overground installation
Installation
Initial operation
for the system was carried out by your specialist company:
Name/Signature
Date
Order no. 28500 / 28530 / 28541 / 28550
Product advantages
Telescopic height adjustment of upper cover section,
can be turned and tilted
Adaptation of the cover to the tile pattern
Compression seal flange for the connection of humidity seals
Connection of further inlets
by pre-scoring the areas at the side
As a twin lifting station for increased soiled water occurrence
Instruction
City
Stamp of specialist company
Change status:
03/2015
Part number:
010/-047
Subject to technical modifications