25~28mm
28~38mm
38~48mm
48~58mm
58~68mm
Secure the ADB to the roof through the rooftop air conditioner using the four
supplied bolts.
Using a torque wrench, tighten the screws to a torque range of 2.5 Nm ± 0.3 Nm.
Take care not to overtighten.
Communication Cable
• Connect the 4- pin communication plug to the socket on the side of the display (2)
in the ADB panel.
• Ensure the cable is routed through the small opening away from the filter area.
• Secure any excess cable to the bracket.
• Press the filter screen fully into place.
1
2
3
4
5