Start-Up

8.1 General

To ensure that start-up is performed correctly, it should only be
carried out by an after-sales service technician authorised by
the manufacturer. These measures can also include an addi-
tional warranty under certain conditions (see Warranty). Start-
up should be carried out in heating operation.

8.2 Preparation

The following items must be checked prior to commissioning:
All of the heat pump connections must be installed as de-
scribed in chapter 7.
The heat source system and the heating circuit must have
been filled and checked.
The dirt trap in the brine circuit must be installed.
All valves that could impair proper flow in the brine and heat-
ing circuits must be open.
The heat pump manager must be adapted to the heating
system in accordance with the controller's operating instruc-
tions.
The mounted hydraulic 4-way reversing valve assembly
must be adequately insulated on-site once the installation
is complete.
The hydraulic network must be flushed correctly before in-
stalling the heat pump. This includes the supply line to the
heat pump. Only when flushing is complete can the heat
pump be hydraulically integrated.
The dirt traps present as standard or included for assembly
must be inspected between 4 and 8 weeks after the heat
pump is commissioned or changes made to the heating
system and cleaned if necessary. Further maintenance in-
tervals must be scheduled depending on the level of soil-
ing, which must be defined and carried out by a suitably
qualified person.
EN-12
Special notes for the integration of heat pumps in
existing systems (renovations):
The existing heat distribution network (pipe materials, connec-
tion types, etc.) and the existing heating systems (e.g. radiators,
underfloor heating, etc.) can impact the quality of the water in
existing systems. Particularly when welded steel pipes or pipes
that are not oxygen diffusion-proof are used, deposits, scaling,
silting or similar may be present that can cause damage in the
heat pump system. This can result in a total failure of the heat
pump The following measures must be observed to avoid this:
Compliance with the water properties and water quality
Flushing of the hydraulic system
Maintenance interval of the dirt traps
If silting or ferromagnetic particles are to be expected in the hy-
draulic network, dirt separators or magnetite separators must
be installed on-site before the medium enters the heat pump.
The maintenance intervals must be defined by a suitably quali-
fied person.

8.3 Procedure

The start-up of the heat pump is effected via the heat pump
manager.
CAUTION!
Commissioning is to be effected in accordance with the
installation and operating manual of the heat pump manager.