Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 17
EN
LASER LEVEL

ACCURACY CHECK

Check of horizontal line
Check of horizontal line is carried out by using 2 walls located
opposite each other at a 5m distance.
1. Place the device close to the wall so that laser emitters are located
opposite to the wall.
2. Move the switch bar to unlocked position. Mark position of
horizontal line on the wall as A1.
3. Turn the device by 180° and mark position of horizontal line on
another wall as B1.
4. Turn the device to the right. Measure vertical deviation of
horizontal line from point B1. If deviation exceeds 1,5 mm, please
contact service center.
10
10
CONDTROL SMART 2D Plus
5m
user manual
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

1-2-4461-2-445

Inhaltsverzeichnis