3. Install the mixing auger by sliding it
onto the evaporator and turning it until it
clicks into place over the pin.
5. Lock the tank in place by pushing the
locking handle forward to seal it.
1
2
3
4. With the locking handle facing up, slide
the reservoir over the installed mixing
auger and evaporator.
6. Insert grid into drip tray. Position them in
front of the base of the main body until
they click into place.
CONTROL PANEL
4
1. Cooling boost button
2. Temperature indicators
3. Cooldown decrease button
4. Screen
5
5. Preset modes indicator
6. Timer button
7. Cleaning mode button
6
8. On/off and menu button.
7
8
E NGLI SH
9