Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Cable-Management Arm - Dell PowerEdge 2650 Installationsanleitung

Rack
Vorschau ausblenden Andere Handbücher für PowerEdge 2650:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 74
Lower the front of the system and engage the front and middle shoulder screws in
6
their slots (the middle slot is just behind the yellow system release latch) (see
Figure 1-7).
When all shoulder screws are properly seated, the yellow latch on each slide assembly
clicks and locks the system into the slide assembly.
Press up on the green slide release latch at the side of each slide to slide the system
7
completely into the rack (see Figure 1-7).
Push in and turn the captive thumbscrews on each side of the front chassis panel to
8
secure the system to the rack.
NOTE: Use the yellow system release latch whenever you wish to remove the system
from the slide assemblies.

Installing the Cable-Management Arm

NOTICE: The cable-management arm can only be installed on the right side of the
rack cabinet (as viewed from the back).
To install the cable-management arm on the system, perform the following steps:
Facing the back of the rack cabinet, locate the latch on the end of the slide assembly.
1
Push the tab on the back end of the cable-management arm into the latch on the end
2
of the slide assembly (see Figure 1-8).
The latch clicks when locked.
Push the tab on the front end of the cable-management arm into a mating latch on
3
the inner segment of the slide assembly (see Figure 1-8).
The latch clicks when locked.
Rack Installation Guide
1-13

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis