Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - ZANKER ZKF 780 Installations & Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für ZKF 780:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation

The following instructions about installation
and maintenance must be carried out by
qualified personnel in compliance with the
regulation in force. The regulation to be
applied for this type of installation is NBN D
5I.003 : "Installations functioning with com-
bustible gas lighter than air".
The side walls of the unit in which the hob is
going to be installed, must not exceed the
height of the working top.
Avoid installing the appliance in the
proximity of inflammable materials (e.g.
curtains, tea towels etc.).
The appliance must be electrically
disconnected before all interventions. If any
electric supply to the appliance is required
to carry out the work, ensure all the
necessary precautions are followed.
Gas Connection
It is indispensible that the connection to the gas mains
are carried out by means of an AGB tap. Choose fixed
connections or use a flexible pipe in AGB (stainless
steel).
If using flexible metallic pipes, be careful they do not
come in contact with mobile parts or they are not
squeezed. Use the same attention when the hob is
combinated with an oven.
This hob can be operated by Slochteren gas (G25)
with a nominal pressure of 25 mbar or by natural gas
with nominal pressure of 20 mbar. No regulation is
required for use by these two types of gas. Before
fitting the appliance ensure that the installation has
the correct voltage for the appliance. At full capacity,
the drop in pressure must not exceed 5%. Such a
drop in pressure is caused by the following
parameters:
-
maximum capacity of meter;
-
diameter and lenght of the tube in front and
behind the meter;
-
section of transit of variuos tubes positioned
on the circuit;
-
diameter of eventual connections.
To ensure a correct operation, a saving of energy and
the long-life of the appliance, the voltage pressure of
the appliance must correspond to the recommended
values.
The adjustable connection is fixed to the
comprehensive ramp by means of a threaded nut G 1/
2". All the components shown in the figure have
already been assembled in the factory.
The appliance, before leaving the factory, has been
tested in order to give you the best results.
Important
When the final connection has been made, it is
essential that a thorough leak test is carried out on the
hob and installation. Use some soapy water, never a
flame.
A - Ramp with ending nut
B - Seal
C - Adjustable connection
11

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis