Herunterladen Inhalt Inhalt Diese Seite drucken

Merach MR-R11 Benutzerhandbuch Seite 17

Rudergerät mit luftwiderstand
Vorschau ausblenden Andere Handbücher für MR-R11:
Inhaltsverzeichnis
INSTALLATION GUIDE
Step 3:
A: When connecting the Silde Rail(#11) to the Main Frame(#1) as shown in Figure A, lift
the Main Frame(#1) using the Pedal Webbing(#76). At the same time, make sure to
align the bottom groove of the track lower cover(#38) on the Silde Rail(#11) with the
Connecting Axle(#59) of main frame between the foot pedals.
B: Apply force downward to complete the assembly as shwn in Figure B.
NOTE:
·Disconnecting or connecting the Silde Rail(#11) requires at least two people.
·To prevent injuries, keep fingers and hands away from the folding mechanism.
Figure A
Figure B
EN
09
Inhaltsverzeichnis
loading

Inhaltsverzeichnis