Herunterladen Diese Seite drucken

Siemens SIPART PS2 EE d Serie Montage-Und Installationsanleitung Seite 27

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Correct and safe operation of this device is dependent on proper transport, storage and installation as well as
careful operation and maintenance.
2
Scope of Delivery of Positioner
Positioner as ordered
D
Model
Single-action
Double-action
Single-action, NPT thread
Double-action, NPT thread
Assembly and Installation Instructions, German/English (enclosed with the device)
D
Leaflet "Operations – a concise overview", German and English (enclosed with the device)
D
3
Assembly
3.1
General
.
Note
The positioner will be equipped at the factory with the required option modules in accordance with
the customer's order, and delivered complete. Retrofitting an option module should only be carried
out by Customer Services.
The positioner must – particularly in damp environments – be installed in such a way that the posi-
tioner shaft cannot freeze in low ambient temperatures.
Warning
!
In zones with potentially explosive atmospheres, the positioner may only be supplied with electrical
energy when the housing is closed.
Warning
!
It is essential that the following sequence is observed during assembly to avoid injuries or mechani-
cal damage to the positioner/extension kit:
1.
Mechanical fitting of positioner
2.
Connection of electric power supply
3.
Connection of pneumatic supply
4.
Putting into operation
C79000-M7474-C157-01
SIPART PS2 EEx d
Order no.
6DR4005-1E
6DR4005-2E
6DR4005-1EN
6DR4005-2EN
see Chapter 3, page 31 (depending on version)
see Chapter 5, page 36
see Chapter 6, page 38
see Chapter 7, page 38
SIPART PS2 EEx d PA
Order no.
6DR4105-1E
6DR4105-2E
6DR4105-1EN
6DR4105-2EN
31

Werbung

loading