Herunterladen Diese Seite drucken

B. Braun PERFUSOR-secura FT Technische Beschreibung Und Bedienungsanleitung Seite 63

Werbung

INSPECTION WITH SERVICE
Manufacturers recommendation for the PERFUSOR FT infusion syringe pump
Fact.-No.:
Appliance No.:
Operator:
Year of purchase:
The INSPECTION with SERVICE is to be carried out according to the check list due reference to the
service manual and the operation instructions subject to technical amendments and should be carried
out within a period of 24 months. The used power pack have to be included in the inspection.
CHECK LIST
1
Record service data
12
Function ACCUMULATOR OPERATION
2
Unit + Power pack
13
Switch on unit (mains supply)
Cleanliness, completeness, damage
- Alarm tone
Moisture attack and other influences
- Display (mains, operation, alarm)
* Clean, seal
- LCD Illumination
.
.
*
3
Open up unit
14
Keyboard test/Display test
- Visibie inspection inside, where necessary clean
- Check conformity with service-
manual, modifications, etc.
15
Prealarm and limit switch with signal
- Integrated power pack
at delivery rate 99.9mi/h
4
Switch cover Rear wall
16
Force between the syringe supports
+ where necessary replace
- Limit at 50-70 N
via spring path of 0.5-1mm
if necessary take measurement through
5
Set up unit ready for use
syringe
pressure 0.8-1.2bar taking into
Seal
consideration pressure loss
κ
6
Housing leakage current < = 0.01mA
Peculiarities/remarks
e.g.: exeptional findings
- Specifications, Accessories
7
Put into operation as per operating instructions
- if necessary pump holder, firm standing,
- Delivery rate accuracy 12%
setting-up at the location, ambient
at max. rate
conditions, interface operation,
Accumulator operation and potential
compensation
8
Staff call and external power supply (plug
+
- Manutacturer's data, modifications
connection and possible cable) FUNCTION
- Unit book
- Last repairs, if necessary main changes to
above mentioned established facts
9
Easy spindle movement
- Dangerous deficiencies
- Directive safety
- Repairs under item R to be carried out
10
FUNCTION: ROTARY KNOB RECOGNITION
carried out
FUNCTION: PRESSURE RECOGNITION
- To Point (X) of check list
FUNCTION: SYRINGE RECOGNITION
*
(e.g. description of faults)
(by fitting the appropriate syringe)
11
Type shield, Labels
¥ if necessary renew
Documentation apart from Check list (ie. unit book/customer service report)
The next inspection date is scheduled
The INSPECTION with SERVICE was carried out by
for the
Date/Signature
Unit handed over to
The order for this service was placed on
B.Braun Melsungen AG
*
.
:
.
.
Instructions for carrying out inspections on the following pages
ese Sence Unan
dane vizem neta
Service-Manual
Seite
Ausgabe
Pangea gemaci werten mac dambr me amen Rechies.
Page
Edition
B Braun Melsu
Fe maarenance Fřemece mest no De cop, rer
Perf.sec.FT
[91]
16
09/91
TECHNE
Med
©
A
whole, nor made acosssidie to tard partes mtaout sur
Content. and nemanas te property ol Our company

Werbung

loading