Herunterladen Diese Seite drucken

Sharp VC-FH3GM/SM Serviceanleitung Seite 26

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

VC-FH3GM/SM
VC-FH5GM..-
INSTALLING THE
MASTER
CAM (AT REAR
REPLACEMENT OF LOADING MOTOR... 2...
SIDE OF MECHANISM CHASSIS)
= =—s_—>
¢« Removal
1.' Make sure beforehand that the shifter is atthe point as
shown below.
2. Place the master cam in the position as shown below.
E ring
(XRESJ30-06000}
Master cam
__Apply grease
Apply grease
Fully turn counterclockwise
Face the wide tooth side ward
Figure 4-44-1,
Note:
See the figure below for the phase matching between the
master cam and the casecon drive gear.
.
Master cam
yy
hy
Me
we
ls]
~
10.2*%3,mm
When installing the master cam,
align the casecon drive gear
round mark with the half-round
notch of master cam.
Figure 4-44-2,
ees
ey eee
Figure 4-46.
The loading motor pressing-in must be less than 147 N (15
kgf).
Adjust the distance between motor and pulley to 10.2
+0
-0.2 mm).
26

Werbung

loading

Diese Anleitung auch für:

Vc-fh5gm