Herunterladen Diese Seite drucken

Sharp VC-FH3GM/SM Serviceanleitung Seite 25

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

? 5
INSTALLING THE SHIFTER
Capstan
D.D. motor
Reet pulley
(Bottom side of mechanism chassis)
Figure 4-42,
insert
point @)
Phase-matching
point @)
VC-FH3GM/SM
VC-FH5GM .
1. Make sure that the loading gear is at the PHASE-
MATCHING point @ as shown below.
:
2. Install, paying attention to insert point G@) and release
point @).
3. For the phase matching at the insert point GD, see the
PHASE-MATCHING point @) as shown below.
4, Finally fix the inserts @) and @).
Phase-Maitching
point @)
Loading gear {T}
Round mark
Insert
point ()
{ 3
[> ->Shaft OD
ue
Insert
point ©)
Figure 4-43.
25

Werbung

loading

Diese Anleitung auch für:

Vc-fh5gm