Herunterladen Diese Seite drucken

Hitachi VM-H38E Wartungsanleitung Seite 31

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4-2.
Major Components
in Subchassis
Removal
'Components to remove
in advance.
4-2-1.
Loading motor <LM>,
Supply guide roller
1)
Loosen the hexagonal
screw.
<SGR> and pressure
roller brake <PRB>
2)
Use a flat bladed screwdriver,
etc.
to turn
(Fig. 4-3)
the top of the SGR in the direction of the
(1) Loading motor <LN>
i ie Rare the SGR from the supply guide
1) Unsolder two (2) points.
Caution:
After reinstalling
the SGR, be sure to
Caution:
Be careful not to damage the flat
perform the following adjustment.
cable.
4-5. Supply/Take-up Guide Roller Height
2) Remove two (2) screws.
Adjustment
in CHAPTER 3
Caution:
After reinstalling
the LM, be sure to
perform the following adjustment.
(3) Pressure
roller brake <PRB>
3. PHASE MATCHING IN ASSEMBLY in CHAPTER 3
is
"Bewaver one -Cl)-Senen:
SUPPLY GUIDE ROLLER BASE
Fig. 4-3
2:PRESSURE ROLLER BRAKE (PRB)
4-2-2,
Upper chassis <UPC> (Fig. 4-4)
1) Remove one (1) screw.
E2-19

Werbung

loading

Diese Anleitung auch für:

Vm-h39e