Herunterladen Diese Seite drucken

HBM PW25-Serie Montageanleitung Seite 10

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mounting and load application
3
Mounting and load application
The load cells are firmly clamped at the mounting holes, the load is applied at
the other end. The recommended screws and tightening torques can be found
in the table below:
Version
Standard
Rustless
1)
Recommended value for the specified property class. Please comply with the screw
manufacturer's instructions with regard to screw dimensions.
Load must not be applied to the side where the cable connection is located, as
this would cause a force shunt.
Intermediate spacer
8
Thread
Max. thread
reach
M6
10 mm
M6
10 mm
Load application / platform center
A03009_02_Y00_01 HBM: public
Min. property
A2-70 or A4-70
Intermediate spacer
Tightening
class
8.8
Connection cable
Mounting
1)
torque
10 N⋅m
10 N⋅m
PW25...

Werbung

loading