4.1 Wall assembly
Before installation, make sure that the sewerage system is at least 1-2 meters below the point in
which the RWS is to be installed (the road level is normally taken as the sewerage level).
The location must have a discharge connected to the sewerage system.
The location must be dry and protected from the rain.
Flat wall, in a horizontal position.
Minimum distance from the ceiling 50 cm.
!
For non masonry walls, provide protection against any leaks of water from the rear of the
system, in the case of problems (see drawing 1 in the attachment).
Proceed as follows:
1.
Position the fixing bracket on the wall and, making sure that it is perfectly horizontal with a level,
mark the position of the holes.
2.
Drill the fixing holes with a D.10 drill.
3.
Fix the bracket to the wall and check that it is level.
4.
Make sure that the bracket is securely fixed to the wall.
5.
Position the RWS unit as indicated in the diagram.
6.
Use the 4 vibration dampers provided between the bracket and the wall (2 vibration dampers)
and between the tank and the wall (2 vibration dampers) to reduce the transmission of vibrations
to the wall.
4.2 Overflow connection
Proceed as follows:
1.
Remove the front cover of the RWS system.
2.
Connect a drainage pipe, which must be DN50, to the system overflow pipe (see fig. 01, point 13,
page 39) + (see drawing 3 in the attachment).
!
NEVER CONNECT A PIPE WITH A SECTION SMALLER THAN DN50 TO PREVENT SYSTEM
MALFUNCTIONS.
!
ANYTHING THAT IS EMPTIED INTO THE OVERFLOW MUST BE VISIBLE (PROVIDE A
"FUNNEL-TYPE"CONNECTION) .