Herunterladen Diese Seite drucken

Parker Ecodrain ED-Serie Bedienungsanleitung Seite 24

Elektronischer kondensatableiter

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN / Operating instructions
Commissioning
► Power the unit.
The system initialisation program is started. This is indicated by the green LED
flashing fast for approx. 3. Seconds (ED3002 - ED3004) or sequential flashing of
the LED in green, yellow and red (ED3007 - ED3100). When the process is
completed the green LED is constantly on.
► Pressurise unit.
► Ensure that condensate enters the drain.
► Inspect connections for leakage.
► Press the test button to open the valve. If you can hear a low flowing noise,
your drain is working properly.
The condensate drain is now ready for operation.
If the potential-free contact is used: complete function test
The potential-free contact is a standard integrated feature of the condensate
drain (not in model ED3002 and ED3004). To complete a function check at the
contact, proceed as follows:
► Disconnect the unit from the power supply.
If there is an alarm signal, the potential-free contact is working properly.
► Reconnect the unit to the power supply.
24
ED3002–ED3100_Int-1_08

Werbung

loading