INTRODUCTION
This IOM is also subject of a safety manual document
to provide necessary information to design, install,
verify and maintain a Safety Instrumented Function
(SIF) utilizing a solenoid valve. It provides necessary
requirements for meeting the IEC 61508 or IEC 61511
functional safety standards.
Installation/Performance Information
All elements of the appropriate Parker Fluid Control
Division (FCD) Installation, Operating & Maintenance
sheets (IOM's) must be followed before installing,
operating and servicing the valve.
The valve must be operated and installed in
accordance with the operating parameters specified in
the IOM, catalog and/or markings on the nameplate.
This includes the electrical and pressure ratings,
temperature limits and environmental conditions.
User must confirm that the valve meets specific
performance criteria required for Safety Instrumented
Functions.
Installations that comply with Functional Safety per
IEC 61508 should consult the FMEDA Report for data
to establish specific Safety Integrity Levels (SIL).
The
valve
has
met
requirements of Safety Integrity Level (SIL) 3. These
are intended to achieve sufficient integrity against
systematic errors of design by Lucifer. A Safety
Instrumented Function (SIF) designed with this valve
must not be used at
statement without "prior use" justification by end user
or diverse technology redundancy in the design
When the final element assembly consists of many
components (solenoid valve, quick exhaust valve,
actuator, isolation valve, etc.) the SIL must be verified
for the entire assembly using failure rates from all
components. This analysis must account for any
hardware fault tolerance and architecture constraints.
The valve should be operated using clean, dry air;
recommended air quality per ISA-SP7.3S.
Service Information
The valve should be observed for performance during
proof and diagnostic testing. Any indication of reduced
performance, such as an increase in leakage rate,
response time, or required shifting pressure, will
require
maintenance
recommended maintenance and service interval is
one year or 100,000 cycles; or after a prolonged
period (approximately six months) of not cycling.
Service
conditions
may
servicing.
Parker Hannifin Manufacturing Switzerland SA
16 Ch du Fbg-de-Cruseilles
1227 Carouge – Geneva, Switzerland
U121V5595 - U121V5596 – U121V55961D - U121V7595
Parker
design
process
SIL level higher than the
of
the
valve.
Normal
require
more
frequent
Installation, Operating & Maintenance
Spool valves series
The recommended minimum operating interval is one
month.
Proof testing and diagnostic testing should be
performed on intervals indicated in the FMEDA report
to maintain the specified SIL capability.
The partial Valve Stroke testing of the safety
Instrumented Function provides a full cycle test of the
solenoid valve. The test itself must be SIL-2 compliant
and performed at a rate at least ten times faster than
expected demand rate.
The time to detect a dangerous failure by partial valve
stroke testing is 730 hours
Any failures affecting functional safety should be
reported to the factory.
When servicing this valve, the user must refer to the
Parker FCD IOM for instructions; original spare parts
must be used when replacing components.
When a valve has been serviced, repaired or if any
maintenance is performed, the valve must be
evaluated for proper function (proof testing).
The mean time to restoration (MTTR) after a safe
failure is 8 hours
PN 493118 PB 407572 - Rev. 4 date: 23.06.2015
Example of U121V
1
2
2
1

Werbung

Inhaltsverzeichnis
loading

Inhaltszusammenfassung für Parker U121V5595 Serie

  • Seite 1 Installation/Performance Information solenoid valve. The test itself must be SIL-2 compliant and performed at a rate at least ten times faster than All elements of the appropriate Parker Fluid Control expected demand rate. Division (FCD) Installation, Operating & Maintenance The time to detect a dangerous failure by partial valve sheets (IOM’s) must be followed before installing,...
  • Seite 2: Technical Specifications

    Certification: IMPORTANT. Above mentioned IS electrical parts Certificate No.Parker Lucifer 0802-28 P0001 C01 and may only be connected to a 24 VDC (nom) 28 VDC FMEDA Report No. Parker Lucifer 0802-28-C R001 (max.) power supply by placing a suitable passive IS- V1R1 safety barrier or an active IS-Interface.
  • Seite 3 Spool valves series U121V5595 - U121V5596 – U121V55961D - U121V7595 VALVE SCHEMATICS U 121 V 55 95 Parker Hannifin Manufacturing Switzerland SA 16 Ch du Fbg-de-Cruseilles 1227 Carouge – Geneva, Switzerland PN 493118 PB 407572 - Rev. 4 date: 23.06.2015...
  • Seite 4 Installation, Operating & Maintenance Spool valves series U121V5595 - U121V5596 – U121V55961D - U121V7595 Notes Parker Hannifin Manufacturing Switzerland SA 16 Ch du Fbg-de-Cruseilles 1227 Carouge – Geneva, Switzerland PN 493118 PB 407572 - Rev. 4 date: 23.06.2015...
  • Seite 5 SIL spécifié. Toutes les parties des instructions de mise en service Le test en course partielle de vanne de la fonction et d’entretien (IOM) de la Division Parker Fluid Control instrumentée de sécurité procure un cycle complet (FCD) doivent être...
  • Seite 6: Caractéristiques Techniques

    électriques ATEX peuvent être utilisées en application alimentation 24 VDC (nom.) 28 VDC (max.) en SIL-3 selon la certification Exida.: Certificat No.Parker Lucifer 0802-28 P0001 C01 et plaçant une barrière de sécurité IS passive ou une Rapport FMEDA No. Parker Lucifer 0802-28-C R001 interface IS active.
  • Seite 7 Série de valves U121V5595 - U121V5596 – U121V55961D - U121V7595 SCHEMA FONCTIONNEMENT ELECTROVALVE U 121 V 55 95 Parker Hannifin Manufacturing Switzerland SA 16 Ch du Fbg-de-Cruseilles 1227 Carouge – Geneva, Switzerland PN 493118 PB 407572 - Rev. 4 date: 23.06.2015...
  • Seite 8 Instructions de mise en service et d’entretien Série de valves U121V5595 - U121V5596 – U121V55961D - U121V7595 Notes Parker Hannifin Manufacturing Switzerland SA 16 Ch du Fbg-de-Cruseilles 1227 Carouge – Geneva, Switzerland PN 493118 PB 407572 - Rev. 4 date: 23.06.2015...
  • Seite 9: Einführung

    Bzgl. Wartung dieses Ventils sollte der Benutzer die Temperaturgrenzwerten und Umweltbedingungen. Installations-, Betriebs- und Wartungsanleitung der Der Benutzer hat sicherzustellen, dass das Ventil die Parker FCD konsultieren; Bauteile dürfen nur durch Leistungsvorgaben der Sicherheitskette erfüllt. Originalteile ersetzt werden. Installationen, gemäß...
  • Seite 10: Technische Daten

    Prüf- und Produktzertifikate nachverfolgen. Unter (trocken) / CO2 Gasen ausgelegt. normalen Betriebsbedingungen sind die Ventile wartungsfrei. Senden Sie nicht einwandfrei arbeitende MAGNETSPULEN Ventile an Ihren örtlichen PARKER LUCIFER Händler. A) Eigensichere Magnetspulen (IS) (ia, ib) 482660, 483330.01, 492965 490860 integrierten Booster.
  • Seite 11 Instalations-, Betriebs-, & Wartungsanleitung Ventile Reihe U121V5595 - U121V5596 – U121V55961D - U121V7595 VERTILGRAFIK U 121 V 55 95 Parker Hannifin Manufacturing Switzerland SA 16 Ch du Fbg-de-Cruseilles 1227 Carouge – Geneva, Switzerland PN 493118 PB 407572 - Rev. 4 date: 23.06.2015...
  • Seite 12 Instalations-, Betriebs-, & Wartungsanleitung Ventile Reihe U121V5595 - U121V5596 – U121V55961D - U121V7595 Notize Parker Hannifin Manufacturing Switzerland SA 16 Ch du Fbg-de-Cruseilles 1227 Carouge – Geneva, Switzerland PN 493118 PB 407572 - Rev. 4 date: 23.06.2015...
  • Seite 13 IOM, Per la manutenzione della valvola, l’utente deve fare nel catalogo e/o sulla targhetta dei dati nominali, tra riferimento alle IOM di Parker FCD e per la cui le specifiche elettriche e di pressione, i limiti di sostituzione...
  • Seite 14: Dati Tecnici

    In condizioni di esercizio COMPONENTI ELETTRICI normali, le valvole non necessitano di manutenzione. A) Componenti elettrici Intrinsically safe (IS) (ia, In caso di anomalie di funzionamento, devono essere restituite al distributore PARKER LUCIFER più vicino. 482660, 483330.01,492965... 490860 servocircuito incorporato.
  • Seite 15 Istruzioni per Installazione, Uso E Manutenzione Valvole U121V5595 - U121V5596 – U121V55961D - U121V7595 SCHEMI FUNZIONALI ELETTROVALVOLE U 121 V 55 95 Parker Hannifin Manufacturing Switzerland SA 16 Ch du Fbg-de-Cruseilles 1227 Carouge – Geneva, Switzerland PN 493118 PB 407572 - Rev. 4 date: 23.06.2015...
  • Seite 16 Istruzioni per Installazione, Uso E Manutenzione Valvole U121V5595 - U121V5596 – U121V55961D - U121V7595 Nota Parker Hannifin Manufacturing Switzerland SA 16 Ch du Fbg-de-Cruseilles 1227 Carouge – Geneva, Switzerland PN 493118 PB 407572 - Rev. 4 date: 23.06.2015...

Inhaltsverzeichnis