Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Dimensions; Aligning The Appliance; Connecting The Appliance; Water Connection - Gaggenau RS 295 Gebrauchs- Und Montageanleitung

Vorschau ausblenden Andere Handbücher für RS 295:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3

Installation dimensions

910
min. 11
770
49
631

Aligning the appliance

To ensure that the appliance functions correctly, it
must be set level with a spirit level.
If the appliance is not level, water may flow out
of the ice maker, ice cubes may be irregular
or the doors may not close properly.
34
631
517
389
1747-1762
38,5- 53,5
90
252
1037
122
1
2
(unit depth)
1
(wall)
2

Connecting the appliance

Have a technician install and connect the appliance
according to the enclosed installation instructions.
Do not remove the transportation protection devices
from the shelves and storage compartments until
the appliance has been installed.
Always connect the water before the power.
Apart from statutory national regulations, you should
stick to the connection terms relating to the local
electricity and water companies.
After installing the appliance, wait at least 1 hour until
the appliance starts up. During transportation the oil
in the compressor may have flowed into
the refrigeration system.
Before switching on the appliance for the first time,
clean the interior of the appliance (see chapter
"Cleaning the appliance").

Water connection

The water may be connected only by a competent fitter
according to the local regulations of the appropriate
water supply company.
m
Caution
721
770
39
39
90
49
90
1
2
90
122
600 39 39
650
39 53
700
39 85
88 321
11
631
321
1165
122

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis