Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Installation Steps Overview; Installation Tools; Disconnection - Zendure SmartFlow Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

5.3 Installation

• If you wish to verify and commission your solar system immediately,
complete the installation when the weather is sunny.
• It is recommended that at least two people participate in the installation.
• Please remember whether connecting or disconnecting Smart PV Hub
with AB1000, solar panels or Mroinverters.make sure SolarFlow is turned
off by pressing and hold the loT button for 6 seconds.

5.3.1 Installation Steps Overview

A. Disconnect the solar panel,Microinverter and the home grid
B. Install Smart PV Hub
C. Install Smart Microinverter
D. Find a place to stack AB1000
E. Connect the top one AB1000 to the Smart PV Hub
F. Connect the Microinverter to home grid
G. Connect the solar panels to the Smart PV Hub
H. Scan the QR code and download the Zendure app. Follow the
instructions of the app to set up device.After 20 minutes, you will get
the SolarFlow power storage system's data on your Zendure app.
Tips:
According to the government's regulations and to ensure safety, the
Microinverter can only start working after connecting to a powered grid
for 5 minutes. To improve the accuracy of the data, the system will verify
and validate it for 15 minutes before showing it on the app.

5.3.2 Installation Tools

Tips:
Before installation, please check all accessories and prepare the
following tools (tools are not included in the purchase )
Phillips Screwdriver
Electric Drill

5.3.3 Disconnection

Tips:
The method of disassembly is subject to the instructions of the
Microinverter, and please confirm the warranty terms of the
microinverse before disassembly.
Hexagon Wrench
Marker Pen
EN
Work Gloves
Tape Measure
9

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

SolarflowPpvh1200

Inhaltsverzeichnis