Herunterladen Inhalt Inhalt Diese Seite drucken

Before Commissioning - probst STS-43-EH-23 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für STS-43-EH-23:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Operation
4
Operation
4.1

Before commissioning

Before each start of work, check that there is sufficient hydraulic oil in the oil tank and that the battery (12
V battery) is fully charged.
Recommendation: Fully charge the battery after each end of work.
51200081
A suitable 12 V charger must be used to charge
the battery.
The battery can either be charged via the 12 V
charging socket
the battery.
ATTENTION: ensure correct polarity of the
connection terminals (
To do this, simply remove the cover
battery box (by loosening the wing nut).
The oil level must be 2 to 3 cm below the top
edge of the oil tank
If necessary, hydraulic oil HLP-46 (according to
DIN 51524 - 51535) must be refilled using a funnel
HLP 46
or similar.
To do this, remove the screws on the front of
the oil tank cover with a suitable tool and then
remove the oil tank cover .
10 / 16
or directly at the +/- poles of
+ +/ - -
)
of the
❸.
GB

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

51200081

Inhaltsverzeichnis