Herunterladen Inhalt Inhalt Diese Seite drucken

Equipment Transport - probst STS-43-EH-23 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für STS-43-EH-23:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Operation
ATTENTION: Keep fingers away from the splitting blades during the splitting process.
Otherwise there is a risk of injury/ and shearing off of the fingers!
4.3

Equipment transport

The empty unit (without stone plate) may only be transported (moved) by hand by lifting/gripping the
transport lever
To do this, the transport lever
51200081
(or the red handles
on the side).
must be moved to the horizontal position. → Fig. 2
Fig. 1
Switch on the control unit. To do this, move the
battery switch
(down). Start the splitting process by pressing
the button
The button must be pressed until the splitting
process is finished (as soon as the button is
released, the upper blade returns to its original
position).
It is recommended to switch off the control unit
at the end of work. To do this, move the battery
switch
to the horizontal position. To protect
against unintentional use of the unit by third
parties, remove the battery switch
It is also recommended to remove the battery
box
and store it in a safe place. To do this,
pull the power plug
battery box
12 / 16
to the vertical position
❸.
❷.
downwards and pull the
upwards (by the handle).
Fig. 2
GB

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

51200081

Inhaltsverzeichnis