Herunterladen Inhalt Inhalt Diese Seite drucken

SPORTSTECH sBike Benutzerhandbuch Seite 32

Smart speedbike
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
6.8 MONITOR HOLDER TUBE
127
Slide the cover cap ('1') with the open side facing up onto the front tube ('14').
On the upper part of the front tube ('14'), loosen the rubber band on the connector ('127').
Pass the connector of cable '127' through the monitor holder tube ('8'). However, do not pass it through
the mounting plate.
Insert the monitor holder tube into the front tube so that the mounting plate points symmetrically to
the rear.
Turn 2 screws '121' through the holes in the front tube ('14') into the threaded holes in the monitor
holding tube ('8').
Tighten the screws by hand using an Allen key.
32
8
1
121
14
#121 2X
M6 x 8l
#135 6X
#123 1X

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis