Herunterladen Inhalt Inhalt Diese Seite drucken

H) Front Axle: Shock Tower, Control Arm, Shock Absorber - Reely titan Bedienungsanleitung

1:10 ep monstertruck titan 4wd (bausatz)
Vorschau ausblenden Andere Handbücher für titan:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

h) Front axle: shock tower, control arm, shock absorber

First install the front shock tower. The two shock towers are shown in the
illustration on the right. The front shock tower "A" is slightly smaller than
the rear shock tower "B".
B
Shock tower is screwed to the front differential using two tapping screws
"C" (thread length 10 mm).
Attach the front vehicle body support "E" to the shock tower from the top
as illustrated. Secure it with two small grub screws "D".
The height is adjusted when the assembly of the vehicle is complete.
A
Now screw two Allen screws "F" into the upper hole of each shock tower
(with the threads pointing towards the rear of the vehicle, see illustration).
They are used later for the upper attachment of the shock absorbers.
E
D
D
F
F
C
C
A
C
D
F
57

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis