Checking the Contents of the
Packing Box
AbraPlan-10
Recirculation Cooling Unit
(optional)
Placing AbraPlan-10
2
AbraPlan-10
Instruction Manual
1. Getting Started
In the packing box you should find the following parts:
1
AbraPlan-10
1
Outlet hose (factory mounted)
1
Inlet hose (factory mounted)
2
Hose clamps, 17 mm
1
Drain angle, 90
0
1
Hose clamp, 35-60 mm
1
Hose for compressed air
2
Hose clamps, 12 mm
1
Hose connection for compressed air
1
Rubber disc 350 mm
1
Flange
1
Bolt M12
1
Allen key 8 mm
1
Set of Instruction Manuals
1
Recirculation Cooling Unit
1
Drain angle, 45
0
1
Funnel
2
Plastic inserts
AbraPlan-10 should be placed directly on a plane and horizontal
floor, capable of bearing the weight of this machine, please refer
to the Technical Data section.