Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting The Grinding Stone/Diamond Grinding Disc; Flushing Unit Head - struers AbraPlan-10 Gebrauchsanweisung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mounting the Grinding Stone/
Diamond Grinding Disc
6
AbraPlan-10
Instruction Manual
Always maintain the correct concentration of Struers Additive in the cooling
water (percentage stated on the Additive container).
Remember to top up with Struers Additive each time you refill with water.
Fit the tank lid and sieve.
Move the unit into place and lead the outlet and overflow
drain hoses into the cooling water tank. Adjust the lengths if
necessary.
If mounting inside, replace the front cover.
Make sure that the grinding stone/diamond grinding disc is intact.
The stone/disc must be dry when mounted and the flange should be

Flushing unit head

Securing finger screws
Stone guard
Dressing arm
Ensure that the sample motor is fully raised, and lift the
shield to gain access to the grinding area.
Make sure that the dressing arm is located in its storage
position (on the left-hand side).
Lift the flushing unit head and, using its built-in magnet,
attach it to the sample motor mounting arm.
Move the sliding cover on the stone guard across until it is
free at both ends.
Unscrew the 2 finger screws (located on the right-hand side)
Use both the handle and the flushing unit connection to lift
the stone guard up and away to the right.
IMPORTANT
IMPORTANT
clean and smooth.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis