Herunterladen Inhalt Inhalt Diese Seite drucken

SUPAIR FLUID LIGHT Betriebshandbuch Seite 81

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Notice d'utilisation parachute | FLUIDLIGHT
Packing tandem reserve
6. Placing the parachute in its POD (continued).
c. Coil the lines into the space in front of the canopy while keeping 1.20 m of lines for the outer coiling.
1.20 m
Installation marker.
>> The suspension line loops must
have a two fingers width.
d. Tuck away the coiled lines inside the space in front of the canopy while keeping a 1.20m line length for the subsequent outer coiling.
1.20 m
SUPAIR
| FLUIDLIGHT | page 36

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis