Herunterladen Inhalt Inhalt Diese Seite drucken

Operating The Appliance In Passive Houses; Appliance Description; Standard Delivery; Accessories - STIEBEL ELTRON LWZ 180 Bedienung Und Installation

Zentrales lüftungsgerät mit wärmerückgewinnung
Vorschau ausblenden Andere Handbücher für LWZ 180:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INsTALLATIoN
Appliance description
7.3.2 Commissioning
When commissioning the ventilation unit, it is important to check
and document in the commissioning log that combustion exhaust
gases are not penetrating the dwelling in a quantity that is harmful
to health.
Commissioning in Germany
Acceptance is carried out by the local flue gas inspector.
Commissioning outside Germany
Acceptance must be carried out by a specialist. In case of doubt,
you must involve an independent expert in the acceptance pro-
cedure.
7.3.3 Maintenance
Regular maintenance of the combustion equipment is prescribed.
Maintenance includes checking the exhaust gas extraction system,
the free pipe cross-sections and the safety equipment. The rele-
vant qualified contractor responsible must prove that there is a
sufficient flow of combustion air.
7.4

Operating the appliance in passive houses

If operating the appliance in a passive house, the factory-fitted
outdoor air filter must be replaced. See chapter "Appliance de-
scription / Accessories".
8.

Appliance description

8.1

Standard delivery

The following are delivered with the appliance:
- Wall mounting bracket
- 2 star grips as spacers for the rear of the appliance
- Condensate drain hose, hose clip, mounting bend
- 4 twin connectors, nominal diameter 160
8.2

Accessories

- Programming unit
- Silencer attachment ( LWF SDA 180/280 )
- For installation of the equipment in passive houses: Outdoor
air filter  ePM1 ≥ 50% (F7)
You can obtain ventilation pipes, extract air and supply air vents
and similar accessories from us.
LWZ 180, LWZ 280
- Enthalpy heat exchanger
38  |  LWZ 180    /   L WZ 280 / LWZ 180 Enthalpie / LWZ 280 Enthalpie 
9.

Preparation

9.1

Storage

Material losses
!
Never store the appliance in dusty places.
9.2

Installation site

Material losses
!
Never install the appliance outdoors.
Material losses
!
Check whether the wall can bear the weight of the appli-
ance. A plaster board or metal framed wall is inadequate.
Additional measures such as a double skin or additional
supports would be needed in such cases.
- Ensure the appliance is level after installation.
- The installation room must have an adequate condensate
drain with siphon.
- The installation room must be free from the risk of frost.
Minimum clearances
If you wish to install the silencer attachment, which is available
as an accessory, observe the minimum clearances it requires.
≥300
≥300
www.stiebel-eltron.com

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Lwz 280Lwz 180 enthalpieLwz 280 enthalpie

Inhaltsverzeichnis