Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly And Connections; Chassis; Transport Handle; Operation - Storch HighDry 300 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für HighDry 300:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

5.3 Assembly and connections

5.3.1 Chassis

Assemble the chassis with the enclosed assembly materi-
al as shown in the illustration below:
-
First assemble the foot with the 4 fastening screws
on the lower side towards the front of the device.
-
Then use the fastening screws to fasten the axle on
the lower rear side.
-
Now push the wheels on the left and right sides of
the axle, followed by one washer and one nut on
each side.
Make sure that all screws are firmly and securely tighte-
ned.
Fig. 2

6. Operation

6.1 Basic safety information

Warning: Electric shock
-
Only connect the device to a socket outlet (230 V) with a PE contact that has been correctly installed by
a qualified electrician.
-
Couplings with extension cables and connecting cables must be splash-proof.
-
Use only if the power cable is in perfect condition.
-
The building dryer is not explosion-protected!
-
Never operate the device without the air filter
-
Check and clean or replace the air filter depending on its condition before starting up (see Fig. 4).
-
Check and, if necessary, empty the condensate container before starting up.
-
Check that the condensate container is correctly seated to ensure that the contact switch functions cor-
rectly when the container is full.
-
Always operated the device in an upright position.
-
Close all doors and windows in the room.

6.2 Fitting the air filter

Translation of the original instruction

5.3.2 Transport handle

The transport handle is also installed with 4 fastening
screws as shown in the following illustration:
Fig. 3
Fig. 4
80

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis