Herunterladen Inhalt Inhalt Diese Seite drucken

Landing Gear Installation; Battery Installation; Receiver Diagram - Modster HOBBY Arrows 1300mm Zivko Edge 540 Betriebsanleitung

Quelle: modster.at
Vorschau ausblenden Andere Handbücher für HOBBY Arrows 1300mm Zivko Edge 540:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Manual - Zivko Edge 540

Landing gear installation

1. With the airframe inversed, install the landing
gear and holder components into the slots on
the fuselage as shown.
2. Secure the landing gear onto the fuselage with
the included screws.
Propeller and spinner installation
Assemble the propeller & spinner as shown below.
Note: The motor should rotate clockwise when
viewing the plane from the rear.

Battery installation

1. Remove the battery hatch.
2. Remove the hook and loop tape from the
fuselage. Apply the looped surface to the battery.
3. Install the battery into the fuselage- securing it
with the preinstalled battery straps.
Note: The weight of each battery may vary due to
different manufacturing techniques. Move the
battery fore or aft to achieve the optimal center of
gravity.

Receiver diagram

The cables from the servo connector board should be
connected to your receiver in the order shown. Note
that the LEDs can be powered by any spare channel
on the receiver.
Tuck the wire leads into the recessed cavity towards
the rear of the battery hatch.
20
www.modster.at

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

290139

Inhaltsverzeichnis