Herunterladen Inhalt Inhalt Diese Seite drucken

Post-Connection Check - Endress+Hauser iTEMP TMT84 Kurzanleitung

Temperature head transmitter with profibus pa protocol
Vorschau ausblenden Andere Handbücher für iTEMP TMT84:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

TMT84
Fig. 8: Shielding and one-sided grounding of the fieldbus cable shielding
1
Supply unit
2
Distribution box (T-box)
3
Bus terminator
4
Grounding point for fieldbus cable shielding
5
Optional grounding of the field device, isolated from cable shielding.
4.4

Post-connection check

After installation of the device, and before electrical commissioning, always perform the
following final checks:
Device condition and specifications
Are the device or the cables free of damage (visual check)?
Electrical connection
Does the supply voltage match the specifications on the nameplate?
Do the cables used comply with the fieldbus specifications?
Do the cables have adequate strain relief?
Are the power supply and signal cables correctly connected?
Are all the screw terminals well tightened and have the connections of the
spring terminals been checked?
Endress+Hauser
Notes
-
Notes
9 to 32 V DC
See Operating Instructions
-
See the connection diagram on the
top of the head transmitter
→ Page 34
Wiring
A0008770
37

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis