Installation in the Panel-mount Enclosure

Available Ports
Both of the RJ45 ports on the PROFINET option can be used when the option is installed into a
panel-mount model. With both ports available, ring and linear PROFINET topographies can be
supported by this installation.
PROFINET Connector for Panel-mount Installation
The installed interface can be connected to the network using a standard 180 PROFINET connector
or a standard network patch cable.
2.5.

PCB Switch Settings

PCB switch settings are described in this section, including settings for main PCB switches and the
discrete I/O (relay) switch.
2.5.1.

Main PCB Switches

Four switches (indicated in Figure 2-60, which shows the Analog version of the terminal) are
located on the main PCB. These switches function as shown in Table 2-5.
2-40
METTLER TOLEDO IND570 Weighing Terminal Installation Manual
Switch
SW1-1
Metrology Security Switch (legal for trade).
When in the ON position, this switch reduces Administrator
access to Maintenance level which prohibits access to the Scale
block in the menu tree and other metrologically significant areas.
This is true even if no scale approval option is selected in setup.
SW1-2
Flash Software.
Set in the ON position during software download
Set in the OFF position during normal operation
SW1
Figure 2-60: Main PCB Switches
Table 2-5: Functions of Main PCB Switches
Functions
SW2
When both SW1-1 and
SW1-2 are set to ON and
power is cycled, a Master
Reset is performed.
Metrologically significant
data are not reset unless
SW2-1 is also set to ON.