Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance Schedule - SHERCO 250 SE RACING Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

MAINTENANCE SCHEDULE

After
Every
MAINTENANCE
5 hours
20 hours
ENGINE
Change gear box oil
Check the valves and booster system
Replace spark plug (after 50 hours)
CARBURATOR
Clean the carburator and emptying float chamber
ACCESSORIES
Check cooling system for leaks
Check sealing and attachment of the exhaust
Check status, flexibility and position of the cables, adjust and lubricate
Check oil level in clutch master cylinder
Clean air filter and housing
Check status and position of the electrical wiring
Check function of electric components (headlight/tail/stop turn signals,
computer control unit, etc.)
BRAKES
Check brake fluid level, brake pad thickness and the brake discs
Check status and sealing of the brake lines
Check status, of the foot brake pedal and hand brake lever
Check tightness of brake system fastners and discs
CHASSIS
Check for leaks and function of fork and shock
Clean the dust covers
Purge air from the fork legs
Check general tightness of bolts and screws
Check / adjust steering head bearings
WHEELS
Check rims and spoke tension
Check condition of the tires and tire pressure
Check chain, sprockets, guides, chain tension
Lubricate the chain
Check wheel bearing clearance
143

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis