Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Removal Of The Pump Elements; Ventilation Of The Pump - MBZ EP-1 Original - Betriebs- Und Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Adjusting the delivery rate:
All pump elements are set to full stroke by the manufacturer.
Remove screw plug (2) with Allen key (A/F 5).
Set screw (3) can be turned with a screwdriver.
Turning clockwise reduces the output rate.
Turning counter-clockwise increases the output rate.
Maximum stroke of set screw is 2.4 mm = 6 notches.
1 turn of set screw is 0.8 mm = 2 notches.
Tighten screw plug (2) incl. sealing ring.

10.3. Installation and removal of the pump elements:

Only install / remove when pump is off.
Install pump element with partially extended piston (4) and insert it at an angle into the housing
drilling(see diagram A).
When the piston head rests on pressure ring - move element into vertical position (see
diagram B).
Piston head must run in guide ring groove.
Tighten the pump elements.
For removal, reserve above sequence.
When removing the pump element, ensure that the piston (4) is not left behind in the pump
housing.
Diagram A:
4
The pump element or the pump are destroyed at first operation, if the pump
Attention!
element has not been positioned correctly.

10.4 Ventilation of the pump

- Remove screw plug (2) with Allen key (A/F 5).
- Screw the adjusting screw (3) by means of a screw driver until stop
- Start the pump
- Screw back the adjusting screw (3) by 1 notch per revolution of the agitator blade
- Operate the pump until oil comes out of the screw plug thread
- Assemble the screw plug (2) incl. sealing ring and tighten it
Diagram B:
2
BEKA 2016 All rights reserved!
EN
21

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Fkggm-ep dcFkggm-ep

Inhaltsverzeichnis