UK
4.
Marking and leveling the site
Diagram 1
1.
Mark the centre of the site and drive a stake or screw driver into the soil.
2.
Tie a piece of string onto the stick. At the other end of the string, tie a funnel.
The distance between the stick and the tunnel should be 15cm more than the radius of
the pool
3.
Place flour, chalk dust or lime into the funnel and draw a circle around the stake.
lf the smallest diameter is 360 cm, then the 2 circles should be 390 cm in diameter.
See diagram 1
Attention
Be as thorough as possible when you work out the site. Make sure the site is complete-
ly firm and level.
MV-2908-2909-2920-2021-11-2017 . © All rights reserved Swim & Fun Scandinavia ApS
129