Herunterladen Inhalt Inhalt Diese Seite drucken

Routine Maintenance; Connection To The Flue - Dal Zotto DZ LP30 Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

rOuTINe MAINTeNANCe

In order to guarantee proper functioning and safety of the device, the operations indicated below must be performed every
season or more often when necessary.
DOOr, Ash DrAWer AND burN POT gAsKeTs
The gaskets guarantee the tightness of the stove and its consequent good functioning.
These must be checked regularly: if they should be worn or damaged they must be replaced immediately.
These operations must be carried out by a qualified technician.

CONNeCTION TO The FLue

Suck and clean the pipe that leads to the flue yearly or anytime that it is necessary. If there are horizontal tracts the residues must
be removed before they can obstruct flue passage.
NON-CLeANINg jeOPArDIses sAFeTy.
IF The POWer suPPLy CAbLe Is DAMAgeD, IT MusT be rePLACeD by The AFTer-sALes serVICe Or by
A sIMILArLy quALIFIeD PersON, sO As TO AVOID AL rIsKs.
FOr COrreCT FuNCTIONINg, The sTOVe MusT uNDergO rOuTINe MAINTeNANCe by A quALIFIeD
TeChNICIAN, AT LeAsT ONCe A yeAr.
MAKe sure ThAT The Ash Is COMPLeTeLy COLD beFOre eMPTyINg IT INTO A suITAbLe CONTAINer. *
The "ChIMNey sWeeP" bIN Is AN ACCessOry AVAILAbLe FrOM The COMPANy.
D
C
70
C
b
b
A
b
C
D
A
e
b
| eNgLIsh
Fumes motor
(disassembly and
cleaning and fumes
pipe and "T"), new
silicone in the
provided points
Inspections of
gaskets, ash drawer
and door (replace
them and apply
silicone where
envisioned)
Combustion chamber
and heat exchanger
(full cleaning)
including ignition-
plug pipe
Feed box (complete
emptying and
cleaning).
Check air intake pipe
and cleaning of the
flow sensor

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis