Herunterladen Diese Seite drucken

Pelgrim IDK 935 Anleitung Seite 74

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

installation dimensions
23
The bridges on the connecting block can be used to
create the required connections, as indicated in the
illustrations on the previous page.
Do not connect the bridges directly to the connecting
wires, but between the screw head and clip on the
connecting wire.
Fix the cable with a pull relief and close the cover.
Ensure the connecting point remains easily accessible.
2 or 3 phase operation
The hob can be adjusted for 2-phase operation. During 2-phase operation the
total capacity of the left-hand and middle generator is limited to 3.7 kW. The
individual cooking zones retain their maximum capacities but the total capacity
of the three left-hand zones will be limited by blocking certain combinations.
Adjusting to 2 or 3 phases:
1. Switch the front centre cooking zone on and off again.
2. Press both - buttons for the middle zones simultaneously for 3 seconds.
3. '2F' and '3F' will appear in the displays.
4. Select the required setting using the - button.
5. The selected setting will remain visible and the other will
disappear.
6. You will hear a bleep.

Werbung

Fehlerbehebung

loading